查电话号码 繁體版 English Francais日本語
登录 注册

flight readiness review造句

"flight readiness review"是什么意思  
造句与例句手机版
  • A second Flight Readiness Review took place on 30 31 May 2007.
  • On 21 22 January 2009, mission managers met for the program level Flight Readiness Review ( FRR ).
  • Top NASA managers held a Flight Readiness Review ( FRR ) meeting 15 16 August 2006 to finalize the launch date.
  • Unique information such as internal NASA memos, Flight Readiness Review documents, and Space Shuttle flight plans are added daily.
  • On 16 October 2007, NASA Managers completed the Flight Readiness Review, and held a press conference to announce the mission plan.
  • On Friday, a Flight Readiness Review panel was satisfied that NASA shuttle and safety teams and independent inspectors had found and fixed the problem.
  • Cintron and Langdoc registered their concerns over the station at an Oct . 2 flight readiness review, a formal NASA proceeding to authorize the mission.
  • An agency-wide Flight Readiness Review ( FRR ) was held at KSC in Florida on 5 May 2010 to discuss Atlantis'launch preparations.
  • NASA's public affairs office had said following the flight readiness review that O'Connor and Scolese would not talk to the media about their objections.
  • It will now go through what's known as a flight readiness review before the upcoming launch so engineers can make make sure all systems are working properly.
  • It's difficult to see flight readiness review in a sentence. 用flight readiness review造句挺难的
  • Following the final Flight Readiness Review on 30 November 2007, NASA managers announced that " Atlantis " was ready to fly, and the launch date of 6 December 2007 was confirmed.
  • The Falcon 9 launch vehicle arrived at SpaceX's Cape Canaveral, Florida facilities at Flight Readiness Review ( FRR ) was completed by NASA and stated that a 30 April launch was feasible.
  • He told the board he was unaware of any safety concerns about flyaway tank foam and, if he had been, would have raised his hand at the flight readiness review and halted the launch.
  • The crew completed the terminal countdown demonstration test on 19 July 2007, and the Flight Readiness Review meetings were held on 25 26 July 2007, after which NASA managers declared STS-118 a " GO " for launch.
  • Despite his outward image as a stickler for doing things according to regulations, Lucas flagrantly violated them by ordering his managers not to raise any Marshall-related issue during the " Flight Readiness Review " process that could cause a delay in the launch.
  • The next milestone in the launch preparations was the Flight Readiness Review from 27 28 February 2007, during which time managers, engineers and contractors examined the readiness of the Space Shuttle, flight crew and payloads to determine whether everything was set to proceed for launch.
  • The final flight readiness review ( FRR ) meeting for the STS-129 mission took place at Kennedy Space Center during the last week of October 2009 . The FRR had approved the installation of a special minicam pointing out of window 4 on Atlantis'flight deck.
  • The Flight Readiness Review ( FRR ), a meeting during which NASA managers assess mission preparations and officially set the launch date, concluded on 3 June 2009 . For the first time, live status updates about the FRR were published periodically during the meeting via NASA's Twitter stream.
  • We have openly discussed our position in the Flight Readiness Review  open communication is how we work at NASA . The Flight Readiness Review board and the administrator have heard all the different engineering positions, including ours, and have made an informed decision and the agency is accepting this risk with its eyes wide open ."
  • We have openly discussed our position in the Flight Readiness Review  open communication is how we work at NASA . The Flight Readiness Review board and the administrator have heard all the different engineering positions, including ours, and have made an informed decision and the agency is accepting this risk with its eyes wide open ."
  • 更多造句:  1  2
如何用flight readiness review造句,用flight readiness review造句flight readiness review in a sentence, 用flight readiness review造句和flight readiness review的例句由查查汉语词典提供,版权所有违者必究。